A tell-tale sign

With construction work at cruising speed, the metamorphosis towards a fully operative, modern laboratory is ever more noticeable. The installation of the HVAC system, the pulsing heart of the lab, is now installed and ready to be connected with the 25 intelligent fumehoods. Automatic control of required air supply makes these systems particularly safe for our scientist. Moreover, with up to 8 lab volumes of air being regenerated per hour, the system is compliant with modern legal requirements for laboratory spaces. To reduce ecological impact, further investments were made in heat recuperation technology to recover up to 80% from evacuated air.

The floor consists of an epoxy coating with a neutral, soothing grey finish. Epoxy flooring is highly suitable due to its wear resistance and impermeability, while its appearance nicely matches with concrete structural elements and visible piping of the HVAC system. The industrial interior design is further complemented by the stylish and durable steel lab infrastructure, the installation of which has now been initiated.

Although most of the action is occurring inside of the building, a peculiar landmark makes clear we will be heading for Deinze soon. Our logo, using an edgy font on aluminum background, is mounted on top of the building’s exterior wall and quietly awaits our arrival.

 

 

 

 

laten staan voor slideshows


I'm a small Introtext for the Register Module, I can be set in the Backend of the Joomla WS-Register Module.



  or   Login
×